Single View for activity

Information Detail
Proponent Garde côtière canadienne
Contact Nicole Perron
Localization of activity Voie navigable du St-Laurent: Traverse du Nord, Bécancour, Lac St-Pierre, Traverse Cap-Santé
Frequency
Beginning of activity 2017-05-30
End of activity 2017-10-31
Type of dredging Maintenance dredging
Types of equipment Hydraulic dredges
Types of spoil Gravel (3%)  |  Pebbles (1%)
Spoil disposal Open water
Surface dredged (m²)
Volume dredged (m³)

Activity map

Legend

  • Dredging site Dredging site
  • Disposal site Disposal site

Activity sites

Type of site Latitude Longitude
Disposal site 46.19694327530828 -72.86819458007812
Back to general list